Peach Ave. construction complete - WAOW - Newsline 9, Wausau News, Weather, Sports

Peach Ave. construction complete

Posted:
MARSHFIELD (WAOW) -

A section of a busy street in Marshfield is open after a summer long construction project.

The south side of Peach Ave. was closed for several weeks. The road was re-paved and new lines were painted. The north side of the road was also due for a make-over.

But the Marshfield city engineer says it was simply repainted to add a middle turn lane. So far, he says he's only heard positive feedback from drivers.

Powered by WorldNow
All content © Copyright 2000 - 2013 WorldNow and WAOW. All Rights Reserved.
For more information on this site, please read our Privacy Policy and Terms of Service.

Persons with disabilities who need assistance with issues relating to the content of this station's public inspection file should contact Chief Engineer Russ Crass at 715-842-2251. Questions or concerns relating to the accessibility of the FCC's online public file system should be directed to the FCC at 888-225-5322, at 888-835-5322 (TTY) or at fccinfo@fcc.gov.