Peach Ave. construction complete - WAOW - Newsline 9, Wausau News, Weather, Sports

Peach Ave. construction complete

Posted:
MARSHFIELD (WAOW) -

A section of a busy street in Marshfield is open after a summer long construction project.

The south side of Peach Ave. was closed for several weeks. The road was re-paved and new lines were painted. The north side of the road was also due for a make-over.

But the Marshfield city engineer says it was simply repainted to add a middle turn lane. So far, he says he's only heard positive feedback from drivers.

Powered by WorldNow
All content © Copyright 2000 - 2014 WorldNow and WAOW. All Rights Reserved.
For more information on this site, please read our Privacy Policy and Terms of Service and Mobile Privacy Policy & Terms of Service.

Persons with disabilities who need assistance with issues relating to the content of this station's public inspection file should contact Chief Engineer Russ Crass at 715-842-2251. Questions or concerns relating to the accessibility of the FCC's online public file system should be directed to the FCC at 888-225-5322, at 888-835-5322 (TTY) or at fccinfo@fcc.gov.